● LIVE
▌DISPATCH 14:32 → JCB 540-180 HiViz → ABERDEEN▌LOLER #LS-22418 SIGNED OFF▌14 MACHINES READY · MANCHESTER▌M6 J19 → 92 MIN ETA▌CPA #114287 · IPHA #2241▌DISPATCH 14:41 → MANITOU MRT 2150 → DUBLIN PORT▌BREAKDOWN RESPONSE 03:47 AVG · YORKSHIRE▌FERRY BOOKED · CAIRNRYAN 18:00▌DISPATCH 15:02 → MERLO ROTO 50.26 → BIRMINGHAM HS2▌FLEET COUNT 480 · 22 DEPOTS▌DISPATCH 14:32 → JCB 540-180 HiViz → ABERDEEN▌LOLER #LS-22418 SIGNED OFF▌14 MACHINES READY · MANCHESTER▌M6 J19 → 92 MIN ETA▌CPA #114287 · IPHA #2241▌DISPATCH 14:41 → MANITOU MRT 2150 → DUBLIN PORT▌BREAKDOWN RESPONSE 03:47 AVG · YORKSHIRE▌FERRY BOOKED · CAIRNRYAN 18:00▌DISPATCH 15:02 → MERLO ROTO 50.26 → BIRMINGHAM HS2▌FLEET COUNT 480 · 22 DEPOTS
§ RESOURCE CENTRE

Field guides
& load charts.

Authored by our in-house compliance lead, reviewed quarterly against the current HSE, CPA and NOCN scheme rules. The questions site managers actually search at 06:30 on a Tuesday — answered in plain English with named standards and worked examples.

§ FORTHCOMING

In the editorial queue

LIFT PLANS · FORTHCOMING

A 90-minute lift plan template for non-routine telehandler lifts

When a job is not a routine repetitive lift, the contract lift plan is your insurance policy. We are preparing a redacted real-world template from a Battersea Power Station retrofit.

IN EDITORIAL REVIEW
MAINTENANCE · FORTHCOMING

First-hour daily checks — the 8 items that catch 90% of telehandler faults

First-hour checks are not a half-hour service; they are the items that, in our fitters' experience, catch the vast majority of in-shift faults before they become downtime.

IN EDITORIAL REVIEW
GLOSSARY · FORTHCOMING

Telehandler glossary — Loadall, Roto, MEWP basket, FOPS, ROPS, hi-flow and the rest

A no-nonsense plain-English glossary covering the most common terms you will find on a UK or Irish telehandler hire docket. Designed to be bookmarkable for new site managers.

IN EDITORIAL REVIEW