Field guides
& load charts.
Authored by our in-house compliance lead, reviewed quarterly against the current HSE, CPA and NOCN scheme rules. The questions site managers actually search at 06:30 on a Tuesday — answered in plain English with named standards and worked examples.

CPCS A77 vs NPORS N139: Which Telehandler Ticket Do Your Site Operators Need?
If you are managing a UK construction site, ensuring your plant operators hold the correct certification is not just about efficiency — it is a strict legal compliance issue. Here is how the two schemes compare on hire day.
In the editorial queue
A 90-minute lift plan template for non-routine telehandler lifts
When a job is not a routine repetitive lift, the contract lift plan is your insurance policy. We are preparing a redacted real-world template from a Battersea Power Station retrofit.
First-hour daily checks — the 8 items that catch 90% of telehandler faults
First-hour checks are not a half-hour service; they are the items that, in our fitters' experience, catch the vast majority of in-shift faults before they become downtime.
Telehandler glossary — Loadall, Roto, MEWP basket, FOPS, ROPS, hi-flow and the rest
A no-nonsense plain-English glossary covering the most common terms you will find on a UK or Irish telehandler hire docket. Designed to be bookmarkable for new site managers.