▌DISPATCH 14:32 → JCB 540-180 HiViz → ABERDEEN▌LOLER #LS-22418 SIGNED OFF▌14 MACHINES READY · MANCHESTER▌M6 J19 → 92 MIN ETA▌CPA #114287 · IPHA #2241▌DISPATCH 14:41 → MANITOU MRT 2150 → DUBLIN PORT▌BREAKDOWN RESPONSE 03:47 AVG · YORKSHIRE▌FERRY BOOKED · CAIRNRYAN 18:00▌DISPATCH 15:02 → MERLO ROTO 50.26 → BIRMINGHAM HS2▌FLEET COUNT 480 · 22 DEPOTS▌DISPATCH 14:32 → JCB 540-180 HiViz → ABERDEEN▌LOLER #LS-22418 SIGNED OFF▌14 MACHINES READY · MANCHESTER▌M6 J19 → 92 MIN ETA▌CPA #114287 · IPHA #2241▌DISPATCH 14:41 → MANITOU MRT 2150 → DUBLIN PORT▌BREAKDOWN RESPONSE 03:47 AVG · YORKSHIRE▌FERRY BOOKED · CAIRNRYAN 18:00▌DISPATCH 15:02 → MERLO ROTO 50.26 → BIRMINGHAM HS2▌FLEET COUNT 480 · 22 DEPOTS
§ ROTATING HIRE · MANCHESTER

Rotating Telehandler
Hire Manchester

Greater Manchester's high-rise regeneration corridor — from Deansgate Square to Stockport town centre — demands continuous-slew rotos for steel erection and glazing placement at height. Our Trafford Park depot holds 4 rotating telehandlers on permanent standby for same-day dispatch across M1–M50 postcodes.

§ DELIVERY · MANCHESTER

Roto delivery logistics — Manchester

Low-loader dispatch via M60 orbital or M56 link. Night deliveries cleared for Trafford Park, MediaCityUK, and Ancoats NQ sites with pre-arranged banksman.

DEPOT
Trafford Park (M17)
TRANSIT
Same-day, 90–120 min low-loader transit
RADIUS
45 km
§ COMMERCIAL ADVISORY

CPA Hire vs. BS 7121 Contract Lift

CPA Model Conditions (Standard Hire)
  • •Machine supplied under CPA Model Conditions for the Hiring of Plant (current edition).
  • •Hirer is the "user" and bears responsibility for safe use, including appointing a competent Appointed Person (AP) under BS 7121.
  • •Operator (if supplied) works under the hirer's direction — the hire company is NOT the principal contractor.
  • •Thorough examination (LOLER) certificate supplied on-hire; hirer must plan lifts and produce method statements.
  • •Suitable for routine material handling, MEWP basket work, and general site lifts within the machine's rated capacity.
BS 7121 Contract Lift
  • •The lifting company (not the hirer) takes FULL responsibility for planning, managing, and executing the lift.
  • •Requires a written lift plan, Appointed Person, Crane Supervisor, and Slinger/Signaller — all employed by the lifting contractor.
  • •Mandatory for any lift classified as "complex" under BS 7121-1:2016 — tandem lifts, blind lifts, lifts over live services, or personnel in the load path.
  • •The lifting contractor carries Professional Indemnity insurance and is liable for the lift outcome.
  • •If using a rotating telehandler as a crane (winch + fly jib), the lift plan must reference BS 7121-5 (mobile cranes) and the machine's crane-mode load chart.

If you are unsure whether your lift requires a CPA hire or a BS 7121 contract lift, call our dispatch team — we will assess the lift scope and advise on the correct procurement route at no charge.

§ CREDENTIALS

Compliance — Manchester

HIRE CONDITIONS
CPA Model Conditions for the Hire of Plant (current edition)
LOLER
Current — every machine carries a valid LOLER thorough examination certificate
OPERATOR TICKETS
CPCS A17 (Telescopic Handler), CPCS A77E (360° Rotating Telehandler), NPORS N139, NPORS N139D (Demolition)
INSURANCE
£10 m public liability; £5 m employers' liability; goods-in-transit cover on every low-loader movement.